Temporary power for municipalities and public authorities

Municipalities and public authorities regularly need temporary power at locations without a fixed grid connection. From works on municipal infrastructure to temporary housing and shelters, from mobile polling stations to public events: the demand for temporary power is diverse and the requirements are high. Reliable, silent and demonstrably clean. Volta Energy delivers exactly that, fully managed through Energy-as-a-Service.

IMG_7945

Temporary power for municipalities: the requirements are higher than ever

Municipalities and public authorities face a dual challenge. On the one hand, they impose increasingly strict requirements on emissions and noise during work in public spaces. At the same time, they must also meet these requirements in their own projects and public tenders. A conventional diesel generator is becoming an increasingly poor fit.

At the same time, grid congestion is increasing. At a growing number of locations, a temporary grid connection is simply not available, or takes months to realise. The temporary power supply must therefore work independently of the grid, be quiet enough for the surrounding environment and demonstrably produce fewer emissions than diesel.

Volta Energy is the energy partner that makes it possible.

What is a Volta and how does it work?

A Volta is a reliable 3-in-1 mobile energy system that combines solar panels, smart batteries and a biofuel backup in one system. During the day, the solar panels generate energy and charge the battery. The battery then delivers continuous power to the installation on site. When capacity falls short, the biofuel backup kicks in automatically.

The system manages itself, is monitored remotely 24/7 and requires no manual actions on location. We take care of delivery, installation, fuel management, maintenance and monitoring. You focus on the project.

IMG_20210713_110852 (2)
IMG_9280

For which municipal applications is a Volta suitable?

Volta Energy supplies temporary power for a wide range of municipal and public authority projects. Common applications include road works and temporary traffic management systems in public spaces, renovations of municipal buildings and public infrastructure, temporary reception facilities without a fixed grid connection, municipal events and community activities in parks or public squares, surveillance and camera monitoring at temporary locations, and election venues and temporary polling stations.

For all these applications: a Volta is ready to deploy immediately, operates without a grid connection and demonstrably produces fewer emissions than a conventional diesel generator.

Why municipalities choose Volta Energy

  • Demonstrable emission reduction for accountability and reporting
    Municipalities are required to report on CO₂ emissions and sustainability performance. A Volta achieves an average of more than 90% less CO₂ compared to a conventional diesel generator. Our monitoring data is available for use in sustainability reports and accountability to the municipal council or provincial authority.
  • Quiet enough for the neighbourhood
    Works in residential areas, parks or near schools require a silent energy solution. A Volta runs completely silently in standard operation. No complaints from residents, no problems with noise standards on site.
  • No waiting for a grid connection
    At locations where grid congestion or the absence of infrastructure makes a connection impossible, a Volta is immediately deployable. Operational within an hour, without waiting for the grid operator.
  • Suitable for low-emission zones and nitrogen-sensitive areas
    On models with a fuel cell as backup, the system is fully nitrogen-free and particulate-free. Ideal for municipal projects in Natura 2000 areas, low-emission zones or areas with active nitrogen restrictions.
  • Fully managed, one point of contact
    For municipalities managing multiple locations or projects simultaneously, Volta Energy delivers one transparent all-in price per system, centralised monitoring and a single point of contact for all sites.

Temporary power in public tenders

A growing number of municipalities and public authorities are incorporating sustainability requirements into tenders for infrastructure and construction projects. Contractors working with Volta systems can demonstrate that the temporary power supply on site meets the specified emission and noise requirements. Our monitoring data supports accountability to the commissioning authority.

For municipalities procuring directly, Volta Energy is available as a direct supplier through a transparent all-in model with no hidden costs.

Energy-as-a-Service

Through our Energy-as-a-Service model, we take full care of energy management. Delivery and transport to site, installation and commissioning, fuel management and timely replenishment, maintenance and 24/7 remote monitoring are all included in a fixed, all-in-one price. At the end of the project, we collect everything.

No separate contracts per location, no unexpected fuel invoices and no operational burden for the project manager on site.

You run the project. We manage the energy.

Sustainable action starts with your own projects.

Frequently Asked Questions about our solution for municipalities and public authorities

  • What is a temporary power supply for municipalities?
    A temporary power supply for municipalities is a mobile energy solution that delivers power at locations without a fixed grid connection, for the duration of a project or works. Volta Energy supplies 3-in-1 energy solutions combining solar panels, batteries and a biofuel backup, fully managed through Energy-as-a-Service.
  • How quickly can a temporary power supply be delivered?
    A Volta is typically operational within fifteen minutes of delivery. Get in touch with our team for current lead times and availability.
  • Does a Volta meet emission requirements for municipal projects?
    Our systems achieve an average of more than 94% less CO₂ compared to a conventional diesel generator. On models with a fuel cell as backup, the system is fully nitrogen-free and particulate-free. We make monitoring data available for use in permit documentation and sustainability reports.
  • Can Volta Energy serve multiple municipal sites simultaneously?
    Yes. We monitor all systems centrally and remotely, and deliver one transparent all-in price per system. One point of contact for all locations, regardless of the number.
  • Does a Volta work without a grid connection in areas affected by grid congestion?
    Yes. A Volta operates fully off-grid and is not dependent on the electricity network. Ideal for locations where grid congestion or the absence of infrastructure makes a temporary connection impossible.
  • Is a Volta suitable for use in low-emission zones?
    Yes. Depending on the model, a Volta achieves an average of more than 90% less CO₂ and significantly less nitrogen and particulate matter. For low-emission zones or areas with the strictest emission requirements, models with a fully nitrogen-free and particulate-free fuel cell are available.
  • Can a municipality include a Volta in a public tender?
    Yes. Get in touch with our team for more information about tender documentation, emission data and the options for framework contracts.
  • Who handles fuel replenishment at remote locations?
    We do. Fuel management is fully included in our Energy-as-a-Service model. We track fuel levels through remote monitoring and arrange timely replenishment, including at locations far from inhabited areas.